Request a quote for a rack elevator.
Pago Bem projeto ou socio.Tenho industria pronta para fabricaçao…
Project requested [28 december 2015] – Ice making machine
Gostaria de um projeto para uma maquina de fabricar gelo estilo a EVEREST com baixo custo de investimento…
Project requested [27 december 2015] – 90º lock
We need design for lock device for scissor lift equipment as the following video example…
FP Projects: Metallic structures – Mezzanines, roofs, stairs, platforms.
My name is Rafael, I am a mechanical engineer and work with the design of metallic structures. I have knowledge in locksmithing, So I can do projects based on the use of material, which considerably reduces execution costs…
Project requested [7 december 2015] – Project of a concrete mixer 400 Detailed Ltrs with dimensions for boiler room,calandra,machining, screw, cremalheirae etcs
Requested Projects FP Become a N1 Member, click here Project Name: Project of a concrete mixer 400 Detailed Ltrs with dimensions for boiler room,calandra,machining, screw, racket etc. Company: City & Condition: Rua Antônio Tuninho Name: Email: Fone: Leandro Project Features: Request Validity: Project of a concrete mixer 400 Detailed Ltrs with dimensions for boiler room,calandra,machining, screw, cremalheirae […]
Project requested [4 december 2015] – platform for motorcycles
Requested Projects FP Become a N1 Member, click here Project Name: Company motorcycle platform: City & Condition: Guarapari es Name: Email: Fone: Jacimar Pagotto Project Characteristics: Request Validity: I already have the sketch of the platform for motorcycles with measurements and material used in it. I need the project done . This […]
Project requested [26 of November of 2015] – Horse trailer design, cars , motorcycles and boat
Requested Projects FP Become a N1 Member, click here Project Name: Horse trailer design, cars , motor, ship company: City & Condition: new hamburg RS Name: Email: Fone: SIDNEI Project Characteristics: Request Validity: I request a horse trailer design , car , motorcycle and the other designs in this category for sales! 12/2015 Images […]
Project requested [18 of November of 2015] – suspension bridge
I need a calculator for sizing steel cables for a suspended walkway over a lake. Sizing cables and pillars…
Project requested [16 of November of 2015] – CNC ROUTER
I intend to assemble a semi-professional CNC ROUTER, with approximate measures of 2000×1000 mm and using a water-cooled spindle. My intention is to try to increase the financial return for my…
Project requested [4 of November of 2015] – Reboque Speed
I'm looking for a project for a speed trailer, to transport motorcycles…
Project requested [3 of November of 2015] – Projeto Elevador Automotivo
I'm looking for the Automotive Elevator Project for cars of 2500 kg…
FP Projects: Treadmill – Airport
It was a high speed treadmill, ideal for long journeys (airports, large malls and hypermarkets).
The belt assembly consists of 5 treadmills, being the first two mats 1 e 2 of acceleration, and the last two mats 4 e 5 of deceleration, see attached images…
Project requested [29 of october 2015] – Dispositivo para enrolar cabo de aço
Requested Projects FP Become a N1 Member, click here Project Name: Steel cable winding device Company: City & Condition: Rua peruibe, 25 – apt 61 Name: Email: Fone: Humberto Siqueira De Abreu Junior Project Characteristics: Request Validity: I need a 2D AutoCAD project of a cable winding device […]
Project requested [28 of october 2015] – Terceirização de projetos
Requested Projects FP Become a N1 Member, click here Project Name: Company project outsourcing: City & Condition: Joinville / SC Name: Email: Fone: Tiago Alan Project Characteristics: Request Validity: I would like to outsource some projects, I would like you to send me resume and portfolio if possible. In addition to description of projects already carried out, localização… 16/11/2015 […]
Project requested [28 of october 2015] – Projeto para elevador automotivo
I need a project so that I can manufacture an automotive lift that lifts between 2.500 e 4.000 tons….
FP Projects: Metal Structures
I've been a designer 17 years old, I have worked on various types of boiler projects,equipment and metallic structures, deliver complete project, with details of each part and complete detail …