FP Project Request
I NEED A PROJECT MANUFACTURING A SAMPLE COLLECTOR FOR CEREALS THROUGH SUCTION.
Requested Project - Diamond mining equipment project |End Day 25 mar 18|
FP Project Request
esteemed,
I need budget for design of diamond mining equipment.
esteira transportadora, vibrating sieve and all other process equipment.
Requested Project - Knife Gate Valve |End Day 22 mar 18|
FP Project Request
Válvula guilhotina para controle de fluxo de saída de silo de cimento com acionamento elétrico.
Diâmetro interno de 261 mm.
Capacidade do silo de 75 tons.
Projeto deve ser sem peças fundidas.
Encaixe circular.
Requested Project - Metallic Cover |End Day 16 mar 18|
FP Project Request
12m by 12m metal cover, 1 Water, U profile.
I need the execution project, detailing for manufacturing, projeto de montagem e respectivas ART's só da cobertura.
Requested Project - Hydroturbine for power generation |End Day 30 mar 18|
FP Project Request
remains of water 6 metros de alturas
water speed 4 meters per second
water channel width, 1500 cm wide x 50 Tall.
To
Calculation and Selection of Keys: Lateral Crush and its Considerations
Our thanks to Engineer Luis Morgado for authorizing the reproduction of his article. [Linkedin]. check out! The engineers, technicians and designers know what the KEY is for, has the function of joining two mechanical elements in order to transmit torque, for example, the shaft-to-gear coupling, with couplings and etc.. Remembering an accident in the decade […]
Belt Conveyors - Belt vs. Drum Friction Factors
for many decades, the coating was used both to protect the drums and to increase the friction available for driving the conveyor belt.. Today, the coating is available in various forms with different capacities and with various characteristics.…