Spreadsheet for calculating heaters with thermal fluid, calculating the required thermal capacity, cargo loss, fluid velocity, line length, flow and pressure.
FP N3 Applications: Spreadsheet for calculation and sizing of CIP set
Worksheet to aid in the calculation and sizing of the CIP set, calculating diameters, heights, installation distances, volumes, booster pump flow and chemical pump capacity.
FP N3 Applications: Worksheet to calculate piping and pressurize fresh fresh juice
Spreadsheet calculates pipe diameter, flow rate, loss of head and number of extractors for fresh juice production.
FP N3 Applications: Spreadsheet for piping calculation and concentrated juice discharge
Spreadsheet calculates pipe diameter, flow rate, loss of head and number of extractors for the production of concentrated juice.
FP N3 Applications: Spreadsheet for simplified cooling tower calculation and sizing
Cooling tower sizing and selection worksheet based on input volume. Including selection curve.
FP N3 Applications: Spreadsheet for calculating the distribution and forecasting of chilled water
Worksheet for sizing the chilled water distribution unit, with calculations of heat dissipation in the distribution network and reservoir, cooling power and reservoir capacity.
FP N3 Applications: Spreadsheet for calculating local runoff and flow in open channels
Spreadsheet for calculating local runoff in open channels of various geometries: rectangular channels, trapezoidal, triangular, circular. Applied on roofs, asphalt surfaces, roads among others.
FP N3 Applications: Worksheet for calculating residential and industrial hot water supply
Spreadsheet for calculation of consumption, generation and volume of hot water for residential or industrial installations.
FP N3 Applications: Spreadsheet for calculating steam generation and pipe diameters
Spreadsheet for steam production calculation, distribution line dimensioning, amount of condensate in the line, linear dilation, cost statement and location and calculation of pipe supports.
FP N3 Applications: Worksheet for calculating compressed air network diameter and piping
Worksheet for calculating compressed air networks, calculating air passage pipe diameter, cargo loss, air speed and system flow, with basic installation of generation system, treatment and distribution of compressed air.
FP Projects: Bench Belt Sander
FP Published Projects: Small Belt Sander, for use on benches and work performed on site.
FP N3 Applications: Positive Gear Pump Calculation Worksheet for Oil
Positive Gear Pump Calculation Worksheet for Oil Calculating Power, flow rate, pressure and other process quantities
FP Projects: Tank for transporting milk (Rodoleite)
Projects Publicized FP Tank for transporting milk (Rodoleite), in order to 9000 liters with three compartments. Made of stainless steel 304 internal e 430 external. self-cleaning system.
FP Projects: Corner Rounder
Complete corner rounding cutter design for plates that divide the soda and beer bales
FP N3 Applications: Simple Horizontal Axis Wind Turbine Calculation Worksheet
Worksheet for Simple Calculation of Horizontal Axis Wind Turbine calculating collected power and dimensioning of the support column
FP N3 Applications: Spreadsheet for Calculation of Turbine Rotors Geometry - Power and H
Turbine Rotors Geometry Calculation Worksheet, calculating geometrical quantities, potency, head and various information for the project