Great ideas – Major Projects: Articulated Forklift for Loading and Unloading Trucks
1-FP Projects
Creative Projects: Trash Collector Float
Great ideas – Major Projects: Garbage Collector based on a solar powered water wheel “CANTON WATER WHEEL”
Requested Project - Artesian or semi artesian well drilling rig |End Day 30 jun 18|
FP Project Request
I request an artesian or semi artesian Drilling Rig project
Creative Projects: HalfBike – Combining Running and Cycling
Video: HalfBike – Combining Running and Cycling
Requested Project - CNC PLASMA CUTTING TABLE |End Day 05 May 18|
FP Project Request
I NEED A PROJECT SIMILAR OR EQUAL TO THIS 3X1.5M CUTTING CAPACITY, PLASMA AND OXI CUT
Requested Project - Project of a RollOn RollOFF platform |End Day 07 May 18|
FP Project Request
I want a rollon rolloff platform project with all measurements correct and I want to know the price.
Requested Project - Artesian or semi-artesian well drill |End Day 30 Apr 18|
FP Project Request
Hi !
I am about to develop an artesian or semi-artesian well drilling rig,
but I don't have a project, would it be possible to help me?
Requested Project - Desgrumador |End Day 30 Apr 18|
FP Project Request
Project to manufacture a Degrumador
Requested Project - SAMPLE COLLECTOR FOR CEREALS |End Day 05 Apr 18|
FP Project Request
I NEED A PROJECT MANUFACTURING A SAMPLE COLLECTOR FOR CEREALS THROUGH SUCTION.
Requested Project - Diamond mining equipment project |End Day 25 mar 18|
FP Project Request
esteemed,
I need budget for design of diamond mining equipment.
esteira transportadora, vibrating sieve and all other process equipment.
Requested Project - Knife Gate Valve |End Day 22 mar 18|
FP Project Request
Válvula guilhotina para controle de fluxo de saída de silo de cimento com acionamento elétrico.
Diâmetro interno de 261 mm.
Capacidade do silo de 75 tons.
Projeto deve ser sem peças fundidas.
Encaixe circular.
Requested Project - Metallic Cover |End Day 16 mar 18|
FP Project Request
12m by 12m metal cover, 1 Water, U profile.
I need the execution project, detailing for manufacturing, projeto de montagem e respectivas ART's só da cobertura.
Requested Project - Hydroturbine for power generation |End Day 30 mar 18|
FP Project Request
remains of water 6 metros de alturas
water speed 4 meters per second
water channel width, 1500 cm wide x 50 Tall.
To
Calculation and Selection of Keys: Lateral Crush and its Considerations
Our thanks to Engineer Luis Morgado for authorizing the reproduction of his article. [Linkedin]. check out! The engineers, technicians and designers know what the KEY is for, has the function of joining two mechanical elements in order to transmit torque, for example, the shaft-to-gear coupling, with couplings and etc.. Remembering an accident in the decade […]
Belt Conveyors - Belt vs. Drum Friction Factors
for many decades, the coating was used both to protect the drums and to increase the friction available for driving the conveyor belt.. Today, the coating is available in various forms with different capacities and with various characteristics.…
Requested Project - Mug Elevator |End Day 27 fev 18|
FP Project Request
I would like a design for a mug elevator, (Soy,corn) but I need all the necessary measures so I can evaluate and move to the manufacturing sector. 20 t/h he could have.