Project Factory Publications

N2 Calculation Spreadsheets: Calculation of Welding Time and Quantity

Worksheet N2: The Worksheet calculates the welding time and the amount of consumable according to the type/measures of chamfer, as well as the amount of consumable.
Types served:
-Fillet
-X chamfer
-V chamfer
-K chamfer
-V/2 chamfer
Electrode Calculations, Mig-Mag, Automatic and Tubular

N2 Calculation Spreadsheets: Column Base Sizing

Worksheet N2: Spreadsheet performs dimensioning of column bases, informing the user of the base hole dimensions, chumbadores, and anchor block.
User must enter column profile information, of baseplate material and anchor bolts.

Requested Project - Clean Room |End Day 27 jul 18|

FP Project Request
1.0 Project development:
1.1 Ultrapure Water Treatment System;
1.2 Compressed Air System and Dryer;
1.3 General Electrical System (Process Machinery and Equipment, UPS, Generator, Lighting and etc.)
1.4 ESD/Electrical Grounding System;
1.5 Special Gas System N2, O2 and AIR;
1.6 Cold Water System;
1.7 Vacuum System;
1.8 Exhaust System;

Requested Project - Hydraulic Sheet Bending Machine. |End Day 01 ago 18|

FP Project Request
I need a sheet metal bending project to bend sheets with up to 3 meters and with thicknesses of up to 8 mm.
I also need a project for a guillotine to cut sheet metal up to 8 mm.

Boilermaking Planning and Design Development – FP

Our sheet metal planning and boiler layout requests interface has just been updated! In this way, we offer greater versatility for your selection and expand the range of geometries developed. Make your request and receive the blank drawing in DWG with the correct layout for the execution of your part and component.

Scroll to top